日一区二区-色丁香婷婷-天堂a在线-av一区在线-成人黄色在线观看-亚洲精品91

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 2020亚洲男人天堂 | a级毛片毛片免费观看久潮喷 | 亚洲你我色 | 操操操网| 欧美精品hdxxxxx| 国内偷自第一二三区 | 免费看一级欧美毛片视频 | 三级全黄的全黄三级三级播放 | 日韩一区二区视频在线观看 | 国产成人精品一区二区视频 | 草草影院www色极品欧美 | 毛片手机在线观看 | 免费三级毛片 | 国产成人午夜精品免费视频 | 黄色三级在线 | 国产成人免费高清激情视频 | 日韩在线播放视频 | 日韩一区二区免费看 | 欧美一级片在线免费观看 | 亚洲在线欧美 | 国产欧美精品一区二区三区 | 亚洲欧美日本视频 | 欧美日韩第三页 | 成年女人色毛片免费 | 午夜精品影院 | 欧美大片在线播放 | 波多野结衣一级片 | 在线观看aaa | 国产精品黄在线观看免费 | 成在线人视频免费视频 | 国产精品久久久久一区二区三区 | 一本色道久久综合亚洲精品高清 | 国产一二三区精品 | 加勒比综合网 | 欧美一区二区三区激情视频 | 亚洲天堂美女 | 国产三级精品美女三级 | 一色屋色费精品视频在线观看 | 超薄肉色丝袜精品足j福利 超级乱淫视频aⅴ播放视频 | 亚洲自拍偷拍网 | 精品欧美一区二区在线观看欧美熟 |